Project Value
$850K
- Site geotechnical investigations
- RPEQ engineering design and certification
- Detailed design documentation
- Design and construction of two new composite bridges
- Demolition and removal of existing bridges
- Installation of new bridge and balustrades
- Installation of adjoining concrete pathways
- Establishment/maintenance period
- Under bridge pipe work including trenching and fitting to existing water services